Contents
- The recipe: 64.2 blocks of 20 cm from one bag of cement
- Our assumptions
- Cost per 20 cm block in Kigali
- Selling price and profit per block
- Profit by machine size in Kigali
- 25 mm or 30 mm shells: what is the difference?
- The Rwandan market
- Which machine for which volume?
- What this calculation does not include
- Sources for the prices
- Frequently asked questions
Short answer: yes, if you sell what the machine makes. In Kigali a machine-made 20 cm hollow block (400×200×200 mm) with 25 mm shells costs about Rwf 592 to make, with cement at about Rwf 14,000 a bag. A Kigali hardware shop lists the 20×40 cm block at Rwf 800; at a cautious Rwf 800–900 the margin is 26–34%. A BLOCKMASTER 4 making 4,000 blocks a day earns ≈US$9,300 a month at the low end of that range.
We use the method of our general guide is a block making business profitable, as in our guides for Uganda, Kenya and Tanzania. Figures are in Rwandan francs (Rwf); we convert at about Rwf 1,477 to the US dollar.
Download the presentation (PDF, 5 pages): the same calculation as a presentation with the BLOCKMASTER 4, 8 and 10, to print or share.
The recipe: 64.2 blocks of 20 cm from one bag of cement
One of our customers made 7,500 hollow blocks of 400×200×150 mm with 30 mm shells from 120 bags of cement, 55.5 m³ of sand and 37 m³ of chippings: 62.5 blocks per bag. A 20 cm block with 25 mm shells needs about 3% less concrete than that block, so one bag makes about 64.2 blocks of 20 cm, or 73 blocks of 15 cm. The machine vibrates and presses a stiff mix, so it gets far more blocks from a bag than hand moulding. Rwandan blocks already use the 40×20 cm face, so our blocks match local sizes.
Our assumptions
- A BLOCKMASTER 4 or CBM 12 with a crew of 8, making and selling 4,000 blocks of 20 cm a day, 26 days a month.
- Cement bought by the truckload at about Rwf 14,000 a bag (estimate). Kigali shops charge about Rwf 15,000 for 32.5 and Rwf 17,000 for 42.5 cement.
- Sand delivered at about Rwf 22,000 per m³ and chippings at about Rwf 28,000 per m³ (estimates; check locally). Every Rwf 5,000 more per m³ of sand adds about Rwf 36 to a block.
- General hands at about Rwf 7,000 a day; a generator burning about 45 litres of diesel a day at the RURA pump price of Rwf 2,927 a litre; 6% added for water, curing, maintenance and breakage.
- Monthly profit is cautious: the low end of the price range, 5% material waste, 30% higher pay for skilled operators, 10% other costs and about US$1,500 a month of fixed costs (manager, security, rent).
Cost per 20 cm block in Kigali
| Item | Price used | Cost per block |
|---|---|---|
| Cement (50 kg bag, 64.2 blocks per bag) | Rwf 14,000 | Rwf 218 |
| Sand | Rwf 22,000 per m³ | Rwf 159 |
| Chippings | Rwf 28,000 per m³ | Rwf 135 |
| Labour (8 people) | Rwf 7,000 a day each | Rwf 14 |
| Diesel (45 litres a day) | Rwf 2,927 a litre | Rwf 33 |
| Water, curing, maintenance, breakage (6%) | Rwf 33 | |
| Cost per 20 cm block | ≈Rwf 592 (≈US$0.40) |
Cement is about 37% of the cost; labour and diesel together only Rwf 47.
Selling price and profit per block
A Kigali hardware shop lists the 20×40 cm concrete block at Rwf 800 and the 15×40 cm block at Rwf 700; an online builders' store lists a 6-inch hollow block at Rwf 650. Older Kigali price lists showed about Rwf 800 for this block when cement was much cheaper, so we use Rwf 800–900 for the 20 cm block; the upper figure is our estimate. Online offers vary widely; check prices in your area.
| Block | Selling price | Cost per block | Profit per block | Margin |
|---|---|---|---|---|
| 20 cm (400×200×200) | Rwf 800–900 | ≈Rwf 592 | Rwf 208–308 | 26–34% |
| 15 cm (400×200×150) | Rwf 650–700 | ≈Rwf 517 | Rwf 133–183 | 21–26% |
The 20 cm block earns more per block and per bag of cement. A BLOCKMASTER 4 making 5,000 blocks of 15 cm a day and selling them at Rwf 650 earns ≈US$6,000 a month on the same cautious basis.
Profit by machine size in Kigali
20 cm blocks with 25 mm shells, at Rwf 800 a block, 26 days a month, cautious costs as above:
| Machine | 20 cm blocks a day | Crew | Fixed costs a month | Profit per month |
|---|---|---|---|---|
| BLOCKMASTER 4 / CBM 12 | 4,000 | 8 | US$1,500 | ≈US$9,300 |
| BLOCKMASTER 8 / CBM 20 | 8,000 | 11 | US$2,500 | ≈US$21,100 |
| BLOCKMASTER 10 / CBM 25 | 10,000 | 14 | US$3,000 | ≈US$27,400 |
We assume about 45, 70 and 70 litres of diesel a day. Selling 8,000 or 10,000 blocks a day needs contractor and project customers, not only walk-in buyers.
25 mm or 30 mm shells: what is the difference?
| 20 cm block | Blocks per bag | Cost per block | Margin at Rwf 800–900 |
|---|---|---|---|
| 25 mm shells | 64.2 | ≈Rwf 592 | 26–34% |
| 30 mm shells | 54.8 | ≈Rwf 684 | 14–24% |
Thinner shells use less cement, sand and chippings, so 25 mm shells are more profitable. A 30 mm shell gives a stronger block and some builders ask for it; offer both and price the 30 mm block higher.
The Rwandan market
- Demand is strong: construction activity grew about 24% year on year in the second quarter, according to national statistics, and brick prices have risen sharply.
- Cement is the big cost: CIMERWA cement went from about Rwf 9,500 to about Rwf 15,000 a bag within a few months this year, so blocks per bag decide your profit.
- Quality sells: contractors want uniform, properly cured blocks that meet the Rwanda block standard (RS 144).
- Diesel and power: the diesel price rose from about Rwf 1,900 to Rwf 2,927 a litre over the past year, but a BLOCKMASTER 4 uses only about Rwf 33 of diesel per 20 cm block.
- Outside Kigali: we found no reliable block prices for Musanze, Huye, Rubavu or Rusizi. Musanze and Rusizi are close to cement plants (Prime Cement and CIMERWA). Around Musanze and Rubavu, volcanic sand and gravel (amakoro) is a traditional building aggregate; test the mix before you use it in blocks.
Which machine for which volume?
- About 4,000 blocks of 20 cm a day: BLOCKMASTER 4 or CBM 12; the egg-laying MBM4 works without pallets.
- About 8,000 a day: BLOCKMASTER 8 or CBM 20.
- About 10,000 a day: BLOCKMASTER 10, or the CBM 25, which also makes paving blocks.
Our nearest installation is a CBM 20 block machine in Uganda; we have also shipped a CBM 20-2 to Uganda and installed a BLOCKMASTER 4 in Kolwezi, DR Congo. Plan your output with block machine capacity calculation; for mix design, see concrete block mix proportions.
What this calculation does not include
Land, buildings, delivery trucks, depreciation, VAT and other taxes, permits, loan repayments, unsold stock and slow rainy-season months.
Sources for the prices
- Blocks and cement: Kigali shop and online store listings, Rwandan press. Diesel: RURA pump price.
- Sand, chippings, the wage, the truckload cement price and the upper block price are estimates; check them locally.
Frequently asked questions
How much does it cost to make a block in Rwanda?
About Rwf 592 for a machine-made 20 cm hollow block with 25 mm shells in Kigali, Rwf 684 with 30 mm shells, and about Rwf 517 for a 15 cm block with 25 mm shells.
How many blocks from one bag of cement?
With our machines, about 64.2 blocks of 20 cm or 73 blocks of 15 cm with 25 mm shells, using sand and chippings.
Does İBAR MAKİNA install the machine in Rwanda?
Yes. We build our machines in our own factory in Çerkezköy, Türkiye, with more than 45 years of experience and installations in more than 30 countries. Installation and operator training are included in the price, machines carry a 2-year warranty and spare parts ship from stock the same day.
Send us your town, the blocks you want to make and your target daily output on WhatsApp, and we will recommend a machine and run these numbers with your local prices.



